Asphalt Project Timeline Planner
Free asphalt paving tool

Asphalt Project Timeline Planner

Choose your scope and options to see how many days or weeks the visit, prep, paving and curing usually take.

These tools give planning-level estimates from typical values and the details you enter. They are not quotes, designs or engineering, and results depend on your actual site, soil, drainage, existing base, availability and local rules. Only a site visit can confirm what a project needs, and we give you an itemized written estimate before any work begins.

How it works

Four quick steps.

  1. 01

    Choose the scope

    Repair, driveway, parking lot or large site.

  2. 02

    Set the options

    Permits, regrading, concrete pads, weather and night work.

  3. 03

    See the phases

    Estimate and permits, scheduling, prep and base and paving and curing.

  4. 04

    Plan around it

    Use the totals to plan vehicles, deliveries and events.

Tips

  • Book early in spring and fall, when paving schedules fill up.
  • Decide permits and drainage changes before scheduling.
  • Keep vehicles off new pavement for a day or two.
Questions

About this tool.

Is this a schedule?

It is a planning estimate. We write a project schedule once the scope is set.

What slows a project most?

Weather, late permits and drainage or base problems found after work starts.

How long is my driveway out of use?

Usually a day or two after paving. We plan removal and paving close together.