Erosion Control and Site Stabilization in Nashville and Middle Tennessee
Site Prep and Base Work

Erosion Control and Site Stabilization

Silt fence, stone, seed and straw, matting and slope work that keeps soil in place during and after paving projects.

Bare ground and heavy rain do not mix. During construction and after, runoff carries soil off the site and into streets, creeks and neighboring yards. That is a problem for the environment and, on larger projects, for compliance with stormwater rules. It also damages the very pavement you just built if shoulders wash out. Middle Tennessee gets plenty of intense storms, so planning erosion control before the first shovel goes in is practical and, on many sites, required.

We install silt fence, wattles, stone entrances and inlet protection where the job requires. After the work, we stabilize disturbed areas by grading gentle slopes, spreading topsoil, seeding and strawing, or placing erosion control matting on steeper slopes. For shoulders along driveways and lots, we add stone or sod to hold them. We can work from a stormwater plan prepared by your engineer, and we keep controls maintained until the vegetation takes hold. Even small projects benefit from simple protections, such as a stone entrance that keeps mud off the street or a strip of straw and seed along a new shoulder. Spending a little on controls early is far less costly than cleaning sediment from a road or repairing a washed-out edge later.

Plan before digging

Silt fence, wattles and stone entrances go in first, so soil stays on the site while work is under way.

Stabilize after paving

Disturbed ground is graded, seeded and covered with straw or matting so grass can establish quickly.

Protect shoulders

Stone, sod or matting along pavement edges keeps rain from washing out the supporting soil.

Follow the plan

We build to your engineer’s stormwater plan where there is one, and we maintain controls until the site is stable.

What is included

  • Free estimate and site review
  • Plan review
  • Perimeter controls
  • Stone entrances and inlet protection
  • Seeding, straw and matting
  • Maintenance until stable
Before and after

See the transformation.

Drag the handle to compare.

After: a rural lane with smooth black asphalt with clean edges and a neat gravel shoulder, with the fence and pasture unchangedBefore: a rural lane with a rough gravel lane through a pasture with a white board fenceBeforeAfter
Rough gravel lane paved. From a rough gravel lane through a pasture with a white board fence to smooth black asphalt with clean edges and a neat gravel shoulder, with the fence and pasture unchanged.
Why it works

What you get with Erosion Control and Site Stabilization

Soil stays put

Silt fence and wattles.

Seed and straw

Grass takes hold.

Matting on slopes

Steeper areas.

Inlet protection

Storm drains safe.

Plan compliance

Stormwater rules.

Maintained

Until stable.

Try it now

Asphalt Paving Budget Planner

Pick a job, set the size and add extras to see a ballpark planning range for your asphalt project.

How it works

Our process, start to finish.

  1. 01

    Call and schedule

    You tell us about your pavement and what you want to change, from a repair to a whole new lot, and we set a visit that fits your day.

  2. 02

    Visit and measure

    We visit, measure, check slope, drainage and the existing base and talk through thickness, edges, borders and finishes.

  3. 03

    Plan and estimate

    We plan the layout and drainage and give you an itemized written estimate with options, so you can compare it with any other bid.

  4. 04

    Prepare the site

    We remove old pavement, grade, correct drainage and build a compacted stone base.

  5. 05

    Pave and finish

    Hot mix is placed and compacted, edges are finished and striping, borders or sealing are completed.

  6. 06

    Walk and care

    We walk the finished pavement with you, explain curing and care and leave the site clean.

Questions

Erosion Control and Site Stabilization FAQ

Do I need erosion control for a driveway?

Larger disturbances often do. We check local requirements.

How soon does grass grow?

Seed usually sprouts in a couple of weeks, depending on the season.

Can you follow an engineer’s plan?

Yes. We install and maintain controls as designed.

What about steep slopes?

We use matting, stone or retaining solutions where needed.

Do you remove controls afterward?

Yes, once the site is stable.

Next step

Get your free Erosion Control and Site Stabilization estimate.

Tell us about your project and we will call you back to set up a visit.

Or call (615) 357-7797 to talk now.

Tell us about your paving project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate