Shaping the ground so pavement drains, sits level and has a firm foundation, from a single driveway to a full commercial site.
Every lasting asphalt surface starts with the ground under it. If the site is not graded correctly, water collects, the surface cracks and the pavement settles, no matter how good the asphalt is. Middle Tennessee’s rolling hills, rock and heavy clay make grading a real craft. A driveway that climbs a hillside, a lot that has to drain toward a storm inlet or a farm lane across a field all begin with the same step: shape the ground first.
We survey the site, mark the cut and fill areas and use skid steers, excavators and graders to bring the ground to the right elevation and slope. We remove topsoil, roots and soft spots, and haul away what you do not need. We plan slopes so water moves toward a safe outlet, and we hand the finished subgrade to the base crew compacted and ready. For larger projects we coordinate with your engineer, builder or surveyor, and follow plans where they exist.
We measure elevations and set stakes for cut, fill and finish grade, so the pavement matches the plan and the site drains.
Topsoil, roots and soft material are removed. Unsuitable soil is hauled off or replaced, which gives the base a firm foundation.
Slopes are set so water runs away from buildings and off the pavement toward swales, inlets or the street.
The finished subgrade is rolled and proof-checked before stone is placed, which prevents settling later.
Drag the handle to compare.

BeforeAfterPavement matches plan.
Water moves away.
Skid steers and excavators.
Spoils removed.
Compacted and checked.
Builders and engineers.
Every topic has its own page with what to expect and how we approach it.
Topic guideDrainage and SlopeHow much slope a driveway needs, where water should go and how to solve puddles, runoff and washouts.Learn more
Topic guideThickness and LayersHow many inches of asphalt and stone a driveway, lot or truck court really needs, and what each…Learn more
Asphalt finishRecycled MillingsA dark, tightly packed surface of reclaimed asphalt pieces with a natural, lightly textured appearance.Learn more Pick a job, set the size and add extras to see a ballpark planning range for your asphalt project.
You tell us about your pavement and what you want to change, from a repair to a whole new lot, and we set a visit that fits your day.
We visit, measure, check slope, drainage and the existing base and talk through thickness, edges, borders and finishes.
We plan the layout and drainage and give you an itemized written estimate with options, so you can compare it with any other bid.
We remove old pavement, grade, correct drainage and build a compacted stone base.
Hot mix is placed and compacted, edges are finished and striping, borders or sealing are completed.
We walk the finished pavement with you, explain curing and care and leave the site clean.
Almost always. Even a flat site needs shaping to drain correctly.
Yes. We plan slope and drainage so it is safe and lasts.
Yes. We remove or reuse spoils as you prefer.
Yes. We build to the plans and elevations provided.
A driveway takes a day or two. Larger sites take longer.
Stone Base and Subgrade PreparationThe hidden half of every paving job: compacted crushed stone laid in lifts over a stable subgrade so…Explore
Drainage Swales and Catch BasinsGrassy swales, catch basins, pipes and trench drains that carry stormwater off driveways and lots before it damages…Explore
Driveway InstallationNew asphalt driveways built right from the ground up: graded, drained, stone-based and paved in smooth, dense hot…Explore
Parking Lot ConstructionNew parking lots built for traffic: engineered base, drainage, curbs, heavy-duty asphalt and layout that works for customers…Explore Tell us about your project and we will call you back to set up a visit.