Long and Rural Driveways in Nashville and Middle Tennessee
Driveway Paving

Long and Rural Driveways

Long driveways and farm entrances built for distance, weight and weather, with culverts, ditches and a base that carries heavy vehicles.

A long driveway is a different project from a short one. It crosses ditches, creeks and slopes, it carries delivery trucks, school buses and farm equipment, and it takes the full force of Middle Tennessee weather with nothing to shelter it. Around Arrington, College Grove, Thompson’s Station and Lebanon, rural driveways often run hundreds of feet and need drainage and structure planned along the whole length.

We walk the full route with you before quoting. We look at where water collects, where culverts or ditches are needed, how steep the grade is and how heavy the traffic will be. We build the base thicker where the load is heavier, stabilize soft soil with fabric and stone, install culverts at crossings and pave in a continuous run with proper compaction. We can also pave only the first section now and extend later.

Plan the whole route

Length, slope, ditches and crossings are mapped out, so we know what drainage and base work is needed before we quote.

Culverts and ditches

Water that crosses a driveway destroys it. We set culverts, shape ditches and direct runoff so it passes under or beside the pavement.

Built for weight

Delivery trucks, trailers and farm equipment need a stronger section. We thicken the base and surface where heavy loads are expected.

Phase it if you like

A long driveway can be paved in stages. We plan the base and drainage for the whole length and pave the first part now.

What is included

  • Free estimate and route walk
  • Drainage and culvert plan
  • Grading and stabilized base
  • Culvert installation
  • Hot mix paving
  • Shoulders, edges and cleanup
Before and after

See the transformation.

Drag the handle to compare.

After: a rural lane with smooth black asphalt with clean edges and a neat gravel shoulder, with the fence and pasture unchangedBefore: a rural lane with a rough gravel lane through a pasture with a white board fenceBeforeAfter
Rough gravel lane paved. From a rough gravel lane through a pasture with a white board fence to smooth black asphalt with clean edges and a neat gravel shoulder, with the fence and pasture unchanged.
Why it works

What you get with Long and Rural Driveways

Built for distance

Whole route planned.

Culverts set

Water passes safely.

Heavy-duty base

Carries trucks.

Phased options

Pave in stages.

Soil stabilized

Soft ground handled.

Edges protected

Gravel shoulders.

Try it now

Asphalt Paving Budget Planner

Pick a job, set the size and add extras to see a ballpark planning range for your asphalt project.

How it works

Our process, start to finish.

  1. 01

    Call and schedule

    You tell us about your pavement and what you want to change, from a repair to a whole new lot, and we set a visit that fits your day.

  2. 02

    Visit and measure

    We visit, measure, check slope, drainage and the existing base and talk through thickness, edges, borders and finishes.

  3. 03

    Plan and estimate

    We plan the layout and drainage and give you an itemized written estimate with options, so you can compare it with any other bid.

  4. 04

    Prepare the site

    We remove old pavement, grade, correct drainage and build a compacted stone base.

  5. 05

    Pave and finish

    Hot mix is placed and compacted, edges are finished and striping, borders or sealing are completed.

  6. 06

    Walk and care

    We walk the finished pavement with you, explain curing and care and leave the site clean.

Questions

Long and Rural Driveways FAQ

How do you price a long driveway?

By length, width, thickness and the drainage work needed. We measure the route and explain each part.

Do I need culverts?

Wherever water crosses the driveway, yes. We plan them as part of the project.

Can you pave a steep driveway?

Yes, within the limits of safe grade. We discuss slope, traction and water control.

Can I pave only part of it?

Yes. We can prepare the whole base and pave in stages.

Will a farm truck damage it?

A properly thickened section handles heavy loads. We build to the traffic you expect.

Next step

Get your free Long and Rural Driveways estimate.

Tell us about your project and we will call you back to set up a visit.

Or call (615) 357-7797 to talk now.

Tell us about your paving project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate