Driveway Replacement and Tear-Out in Nashville and Middle Tennessee
Driveway Paving

Driveway Replacement and Tear-Out

Removing a failing driveway down to a sound base or to the soil, correcting what went wrong and paving it new.

Some driveways are past repair. When the surface is covered in alligator cracking, the pavement has sunk or heaved, water stands on it after every rain or the edges have crumbled away, patching only hides the problem for a season. Replacement removes the old pavement and starts over, and it is the right answer when the base underneath has failed. Many Nashville driveways that are fifteen or twenty years old reach that point.

The key to a replacement that lasts is learning why the old one failed. We look at the thickness of the old asphalt, the stone beneath it, the soil and the drainage. We then break out and haul away the old pavement, repair or rebuild the base, correct the grade and pave a new surface at the right thickness. If part of the base is still good, we keep it, which saves money. If it is not, we tell you plainly.

Find the cause

We cut a test section when needed to see the asphalt, base and soil, so the new driveway fixes the real problem, not just the surface.

Removal and haul-off

Old asphalt is broken out, loaded and hauled away. It is often recycled into new asphalt, which keeps it out of the landfill.

Rebuild the base

Soft spots are dug out and replaced with compacted stone. Fabric can be added over weak clay soil to keep the base from mixing with it.

Pave it new

The new asphalt is laid at the right thickness, rolled dense and finished with clean edges and a drainage-friendly grade.

What is included

  • Free estimate and condition review
  • Test cuts when needed
  • Removal and haul-off
  • Base repair or rebuild
  • New asphalt paving
  • Edge finishing and cleanup
Before and after

See the transformation.

Drag the handle to compare.

After: a driveway with smooth, uniform black asphalt with no cracks and crisp edgesBefore: a driveway with a faded gray asphalt driveway full of long cracks and alligator cracking with weeds in the seamsBeforeAfter
Cracked driveway resurfaced. From a faded gray asphalt driveway full of long cracks and alligator cracking with weeds in the seams to smooth, uniform black asphalt with no cracks and crisp edges.
Why it works

What you get with Driveway Replacement

Complete tear-out

Old pavement removed.

Cause identified

Fix what failed.

Base rebuilt

Strong and level.

Haul-off included

Debris taken away.

Better drainage

Water kept off.

Like new

Fresh and smooth.

Try it now

Asphalt Paving Budget Planner

Pick a job, set the size and add extras to see a ballpark planning range for your asphalt project.

How it works

Our process, start to finish.

  1. 01

    Call and schedule

    You tell us about your pavement and what you want to change, from a repair to a whole new lot, and we set a visit that fits your day.

  2. 02

    Visit and measure

    We visit, measure, check slope, drainage and the existing base and talk through thickness, edges, borders and finishes.

  3. 03

    Plan and estimate

    We plan the layout and drainage and give you an itemized written estimate with options, so you can compare it with any other bid.

  4. 04

    Prepare the site

    We remove old pavement, grade, correct drainage and build a compacted stone base.

  5. 05

    Pave and finish

    Hot mix is placed and compacted, edges are finished and striping, borders or sealing are completed.

  6. 06

    Walk and care

    We walk the finished pavement with you, explain curing and care and leave the site clean.

Questions

Driveway Replacement FAQ

How do I know if I need replacement?

Widespread alligator cracking, sunken areas and repeated failed patches usually mean the base has failed and replacement makes sense.

Can you reuse part of the old base?

Often yes, when it is firm and well compacted. We check it before deciding.

How long does replacement take?

Many driveways are removed and paved within a few days, depending on size and weather.

What happens to the old asphalt?

It is hauled away and commonly recycled.

Is replacement better than an overlay?

Only when the base has failed. If the base is sound, an overlay can cost less. We explain both.

Next step

Get your free Driveway Replacement estimate.

Tell us about your project and we will call you back to set up a visit.

Or call (615) 357-7797 to talk now.

Tell us about your paving project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate