Asphalt Removal and Hauling in Nashville and Middle Tennessee
Site Prep and Base Work

Asphalt Removal and Hauling

Breaking out and hauling away old asphalt so the site is ready for a fresh start, with clean edges and no mess left behind.

When asphalt has failed completely, the right answer is to remove it. Pavement with widespread cracking, a collapsed base or years of patchwork cannot be saved by an overlay. Removal also makes sense when you are changing a layout, widening a drive, adding utilities or converting a driveway to another surface. Done carelessly, it damages lawns, landscaping, sprinklers and neighboring edges. Done well, it is quick, clean and sets up the new work perfectly.

We saw cut the boundary so the pavement breaks cleanly, then use skid steers, excavators and trucks to lift, load and haul the old asphalt away. We protect lawns and landscaping where we can and flag irrigation lines and utilities before we dig. Old asphalt is recycled whenever possible, so you are not paying to dump it. After removal, we check the base, repair what is needed and leave the site ready for new base and paving, often in the same visit. Because every site is different, we walk the property first to plan where trucks will stand, where material will be stockpiled and how to protect fences, trees and neighboring surfaces. Planning the logistics up front keeps the job short and avoids damage that homeowners and managers dread.

Clean cut boundaries

Saw cuts give a straight edge where old and new meet and protect pavement you are keeping.

Protect what stays

We flag sprinkler lines, utilities and landscaping, then use the right size equipment to avoid damage.

Haul and recycle

Old asphalt is hauled away and recycled, so you do not pay to dump usable material.

Ready for new work

The base is checked and prepared after removal, so paving can follow without delay.

What is included

  • Free estimate and site walk
  • Utility and sprinkler marking
  • Saw cutting
  • Removal and hauling
  • Base check
  • Cleanup
Before and after

See the transformation.

Drag the handle to compare.

After: a driveway with a double-car driveway with matching fresh black asphalt and clean edgesBefore: a driveway with a narrow single-car asphalt driveway beside a side yardBeforeAfter
Narrow driveway widened. From a narrow single-car asphalt driveway beside a side yard to a double-car driveway with matching fresh black asphalt and clean edges.
Why it works

What you get with Asphalt Removal and Hauling

Hauled away

Site left clean.

Recycled

Not dumped.

Clean saw cuts

Straight edges.

Protects landscaping

Careful equipment.

Base checked

Ready to rebuild.

Fast

Often a single visit.

Try it now

Asphalt Paving Budget Planner

Pick a job, set the size and add extras to see a ballpark planning range for your asphalt project.

How it works

Our process, start to finish.

  1. 01

    Call and schedule

    You tell us about your pavement and what you want to change, from a repair to a whole new lot, and we set a visit that fits your day.

  2. 02

    Visit and measure

    We visit, measure, check slope, drainage and the existing base and talk through thickness, edges, borders and finishes.

  3. 03

    Plan and estimate

    We plan the layout and drainage and give you an itemized written estimate with options, so you can compare it with any other bid.

  4. 04

    Prepare the site

    We remove old pavement, grade, correct drainage and build a compacted stone base.

  5. 05

    Pave and finish

    Hot mix is placed and compacted, edges are finished and striping, borders or sealing are completed.

  6. 06

    Walk and care

    We walk the finished pavement with you, explain curing and care and leave the site clean.

Questions

Asphalt Removal and Hauling FAQ

Is the old asphalt recycled?

Yes. We take it to recycling facilities whenever possible.

Will you damage my lawn?

We protect lawns where we can and repair what we disturb.

Can you remove just part of a driveway?

Yes. We saw cut and remove only the section you choose.

How long does removal take?

A driveway usually takes a few hours to a day.

Can new paving follow right away?

Often yes, once the base is checked.

Next step

Get your free Asphalt Removal and Hauling estimate.

Tell us about your project and we will call you back to set up a visit.

Or call (615) 357-7797 to talk now.

Tell us about your paving project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate